Sunday 5 July 2009

Allerton Cottage

Week 10.


The brickwork to the kitchen atrium has been completed, the atrium joists have been installed.


The kitchen and atrium roofs have been made watertight.

The roof has been stripped above the existing kitchen where the 1st floor extension is to be built, the joists and deck have been installed and the brick work is starting to go up.