Sunday 5 July 2009

Allerton Cottage

Week 5.


The kitchen outrigger has been demolished, the new link walls have been partly built and the beam & block floor partly installed.


Part of the coach house wall was deemed by our engineer to be dangerous, so it was taken down and rebuilt.


The centre section of the coach house including the dorma window was stripped out to allow us to install a steel post and beams to carry the new staircase.